Question: Draw an activity chart for a machine operator with the following operation. The relevant times are as follows: Prepare mill for loading (cleaning, oiling, and
Prepare mill for loading (cleaning, oiling, and so on) ........ .50 min
Load mill ....................... 1.75 min
Mill operating (cutting material) .............. 2.25 min
Unload mill ...................... .75 min
Step by Step Solution
3.42 Rating (174 Votes )
There are 3 Steps involved in it
Time Operator Prepare Mi... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
256-B-M-L-O-M (1753).docx
120 KBs Word File