Question: Draw an activity chart for a machine operator with the following operation. The relevant times are as follows: Prepare mill for loading (cleaning, oiling, and

Draw an activity chart for a machine operator with the following operation. The relevant times are as follows:
Prepare mill for loading (cleaning, oiling, and so on) ........ .50 min
Load mill ....................... 1.75 min
Mill operating (cutting material) .............. 2.25 min
Unload mill ...................... .75 min