Question: 2. For the following, use the CPM method to determine the project ler critical path, and slack time (time units are in days). D, 3

2. For the following, use the CPM method to determine the project ler critical path, and slack time (time units are in days). D, 3 1, 4 2 5 8 A. 6 J. 4 G, 1 F. 7 6 B, 4 H. 1 C, 17 L, 6 4 K. 3