Question: 4 . 7 . 2 At a metal - working machine shop, small metal parts are produced for assembly into pieces of heavy equipment. The

4.7.2 At a metal-working machine shop, small metal parts are produced for assembly into pieces of heavy equipment. The parts are currently being run in lot sizes of 200 parts. After fabrication, any excess metal is machined off of the parts and the parts are deburred. To study the behavior of the process over time, two lots of parts are randomly selected and inspected at the end of each process for the existence of rough edges, excess metal, and burrs. The number of nonconformities found during the inspection of these parts has been recorded for the two shifts over a period of 10 days. The data are provided in Table 4.8, and a plot of the number of nonconformities is provided in Figure 4.17.
a. Calculate the upper and lower control limits for the chart in Figure 4.17.
b. Does the process appear to be operating in a stable and predictable manner over time?
C Are shift-to-shift differences captured within subgroups or between subgroups? Do differences exist between the two shifts? How is this conclusion reached?

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!