Question: 5. (20 points) Given the following table, construct a network diagram. All times are in days. What is the expected length of each path in

5. (20 points) Given the following table,

5. (20 points) Given the following table, construct a network diagram. All times are in days. What is the expected length of each path in days? Compute the probability that the project will complete in 18 days or less (assume activity times follow a beta distribution and path times are normally distributed). Path Activity A B C D E F. Top Time Estimates Most Likely 5 8 5 8 Optimistic 4 7 3 7 2 1 Pessimistic 6 10 9 11 4 6 Bottom 3 4