Question: A direct time study was taken on a manual work element using the snapback method. The regular cycle consisted of three elements, a , b

A direct time study was taken on a manual work element using the snapback method. The regular cycle consisted of three elements, a, b, and c. Element d is an irregular element performed every five cycles.
\table[[Work element,a,b,c,d
 A direct time study was taken on a manual work element