Question: A direct time study was taken on a manual work element using the snapback method. The regular cycle consisted of three elements, a, b, and

A direct time study was taken on a manual work

A direct time study was taken on a manual work element using the snapback method. The regular cycle consisted of three elements, a, b, and c. Determine the standard time for the cycle if 19% Allowance is given. Work Element a b Observed Time (OT) min 0.93 0.46 0.31 Performance Rating 88% 90% 97%