Question: A direct time study was taken on a manual work element using the snapback method. The regular cycle consisted of three elements, a , b
A direct time study was taken on a manual work element using the snapback method. The
regular cycle consisted of three elements, a b and c Element d is an irregular element
performed every five cycles.
Work element a b c d
Observed time min
Performance rating
Determine a normal time, b standard time for the cycle use PFD of c the average
performance of a worker if she produced units in an hour shift.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
