Question: A direct time study was taken on a manual work element using the snapback method. The regular cycle consisted of three elements, a , b

A direct time study was taken on a manual work element using the snapback method. The
regular cycle consisted of three elements, a, b, and c. Element d is an irregular element
performed every five cycles.
Work element a b c d
Observed time (min)0.560.250.501.10
Performance rating 100%80%110%100%
Determine (a) normal time, (b) standard time for the cycle (use PFD of 10%),(c) the average
performance of a worker if she produced 300 units in an 8-hour shift.