Question: A direct time study was taken on a manual work elements using the snapback method. The regular cycle consisted of elements, a, b, c, and
A direct time study was taken on a manual work elements using the snapback method. The regular cycle consisted of elements, a, b, c, and d. Element e = 3.5 min is an irregular element performed every six cycles. Apfd=16%
Work element a b c d e___
Observed time (min) 3.4 -- 2.55 -- 3.9 -- 2.95 -- 3.5
Performance rating 110% 95% 100% 85% 100%
Determine the standard time for the cycle
-
16.07 min
-
15.25 min
-
13 min
-
13.15 min