Question: A generator bus ( slack bus ) supplies a 1 0 0 MW , 5 0 Mvar load through a transmission line that can be

A generator bus (slack bus) supplies a 100MW,50Mvar load through a transmission line that can be modeled with a lossless short transmission line model with per unit impedance (100MVA base) of j0.12. Also assume there is a 100Mvar capacitor (measured at 1.0 per unit voltage) at the load bus.
A) Determine the bus admittance matrix (Ybus) for the system.
B) Calculate the voltage magnitude and angle at the load bus using the Newton-Rapson method. Use the flat-start. Provide the values after 2 iterations.