Question: A plastic injection molding (PIM) machine for Lego figures makes two different parts (yellow bodies and red hats). One of each part goes into a
A plastic injection molding (PIM) machine for Lego figures makes two different parts (yellow
bodies and red hats). One of each part goes into a final assembly, and the takt time for the
assembly station is the same as the production cycle time = 30 sec/assembly. The cycle time for
the PIM machine is 180 seconds to make 18 parts. The setup time to switch between molds on
the PIM machine is 12 minutes. To manage inventory, a Kanban system is established between
the PIM machine and assembly. The bin size is chosen to be 36 based on the size of the part,
the available space in the assembly area, and the consumption rate. The PIM department will
continue to make a part as long as there is an empty bin available for whatever color it is
running. If there is not an empty bin available, it will wait for the next empty bin to determine if
it should change. Both PIM and assembly work the same hours. Transport time from assembly
to PIM is a maximum of 18 minutes, and is also a maximum of 18 minutes from PIM to the
Kanban area for assembly. Assume that OEE = 1.
What is the part usage (demand) for both yellow and red parts in parts/hour?
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
