Question: Activity Immediate Duration (days) Predecessor(s) A 5 ---- ---- C A 4 1 , , E 8. F 2 G D,E 2 H F,G 3

Activity Immediate Duration (days) Predecessor(s) A 5 ---- ---- C A 4 1 , , E 8. F 2 G D,E 2 H F,G 3 1) Based on the above table, draw an AOA network. 2) List ALL paths and identify the critical path(s).
Activity Immediate Duration (days) Predecessor(s)
Activity Immediate Predecessor(s) Duration (days) 5 2 4 B D E F G 1 8 A B , , DE F G wNN 1) Based on the above table, draw an AOA network. 2) List ALL paths and identify the critical path(s)