Question: An electronics manufacturer makes remote control devices for interactive - cable - TV systems. The following assembly tasks must be performed on each device. Draw
An electronics manufacturer makes remote control devices for interactivecableTV systems. The following assembly tasks must be performed on each device.
Draw the precedence diagram for this problem, then determine the following:
a What is the sum of the task times?
a minutes
b minutes
c minutes
d minutes
b What cycle time will allow the production of units over a tenhour day?
a minutes
b minutes
c minutes
d minutes
c What is the theoretical number of workstations needed?
a
b
c
d
d What is the actual number of stations?
a
b
c
d
e Was there an opportunity to improve the balance of the line based on cycle time yes or no
If so what is the new cycle time, idle time and efficiency?
a; ;
b; ;
c; ;
d; ;
e same as the orginial calculation
f Based on your answer to e what is the total idle time over the hour work day, in minutes?
a
b
c
d
e
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock