Question: Average lead time (LT) is 20 days, with a std. dev. of 6 days (LT). Daily demand (d) is 50 units (constant). Find the safety
Average lead time (LT) is 20 days, with a std. dev. of 6 days (LT). Daily demand (d) is 50 units (constant). Find the safety stock (SS) and the reorder point (ROP) for z=2. SS=600 units, ROP=1000 units SS=900 units, ROP=1900 units SS=600 units, ROP=1600 units SS=53.7 units, ROP=1053.7 units SS=80.5 units, ROP=1080.5 units