Question: Complete the exercise. You will need to: 1. Draw in the arrows that indicate the logical flow of the network. 2. Fill in the durations.
Complete the exercise. You will need to: 1. Draw in the arrows that indicate the logical flow of the network. 2. Fill in the durations. 3. Conduct a forward pass of the network. 4. Conduct a backward pass of the network. 5. Clearly indicate the critical path. WBS ID Activity Predecessor Duration A Order review 1 B Order parts A 6 C Produce parts A 4 D Design parts A 1 E Software Dev. A 3 F Manufacture parts B,C 6 G Assemble D,E 4 H Test F,G 9 B ES ID EF SL LS DUR LF C F A H D G E Name Student ID Project Network Exercise Name: Student ID: Complete the exercise. You will need to: 1. Draw in the arrows that indicate the logical flow of the network. 2. Fill in the durations. 3. Conduct a forward pass of the network. 4. Conduct a backward pass of the network. 5. Clearly indicate the critical path. WBS ID Activity Predecessor Duration A Order review 2 B Order parts A 5 C Produce parts A 7 D Design parts A 9 E Software Dev. A 5 F Manufacture parts B 1 G Assemble C, D, E 3 H Test F,G 1 B ES ID EF SL LS DUR LF C F A H D G E Name Student ID Project Network Exercise Name: Student ID: Complete the exercise. You will need to: 1. Draw in the arrows that indicate the logical flow of the network. 2. Fill in the durations. 3. Conduct a forward pass of the network. 4. Conduct a backward pass of the network. 5. Clearly indicate the critical path. WBS ID Activity Predecessor Duration A Order review 3 B Order parts A 4 C Produce parts A 8 D Design parts A 10 E Software Dev. A 6 F Manufacture parts B, C, D 2 G Assemble E 5 H Test F,G 3 B ES ID EF SL LS DUR LF C F A H D G E N
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts