Question: Compute the control limits for the sample ranges. UCL R = LCL R = Compute the control limits for the sample means. UCL X =

Compute the control limits for the sample ranges.

Compute the control limits for the sample ranges.

Compute the control limits for the sample ranges.

UCLR=

LCLR=

Compute the control limits for the sample means.

UCLX=

LCLX=

Factors for calculating three-sigma limits for the x-chart and R-chart S Factor for LCL for R-Chart (D3) Factor for UCL for R-Chart (D4) Size of Sample Factor for UCL and LCL for X-chart (A2) 1.880 1.023 0.729 0.577 0.483 0.419 0.373 0.337 0.308 ONO 3.267 2.575 2.282 2.115 2.004 1.924 1.864 1.816 1.777 0.076 0.136 0.184 0.223 Aspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine and measures the outside diameter of the bottle neck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions (in.) from the last six samples are Bottle Sample 1 2 3 4 0.597 0.599 0.592 0.621 0.623 0.623 0.615 0.581 0.580 0.589 0.606 0.587 0.623 0.609 0.609 0.619 0.573 0.604 0.595 0.575 0.576 0.572 0.582 0.613 Click the icon to view the table of factors for calculating three-sigma limits for the x-chart and R-chart. Assume that only these six samples are sufficient, and use the data to determine control limits for an R- and an x-chart. Compute the range R and the sample mean x for each sample. (Enter your responses rounded to three decimal places.) Sample Bottle 12 3 0.597 0.599 0.592 0.623 0.623 0.615 0.580 0.589 0.606 0.623 0.609 0.609 0.573 0.604 0.595 0.576 0.572 0.582 4 0.621 0.581 0.587 0.619 0.575 0.613 R 0.029 0.042 0.026 0.014 0.602 0.611 0.591 0.615 6

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!