Question: CONS 3013 - Construction Estimating Assignment #07 1. Estimate the bare cost and total cost including O&P per ton of structural steel for the columns,

 CONS 3013 - Construction Estimating Assignment \#07 1. Estimate the bare

CONS 3013 - Construction Estimating Assignment \#07 1. Estimate the bare cost and total cost including O\&P per ton of structural steel for the columns, beams, and details for a framed steel building cost and total cost including O\&P per ton of structural steel for