Question: Consider the following two assets: Asset A: expected return is 4% and standard deviation of return is 42% Asset B: expected return is 1.5% and
| Consider the following two assets: | ||||||||||||||||
| Asset A: expected return is 4% and standard deviation of return is 42% | ||||||||||||||||
| Asset B: expected return is 1.5% and standard deviation of return is 24% | ||||||||||||||||
| The correlation between the two assets is 0.1. | ||||||||||||||||
| (a) Compute the expected return and the standard deviation of return for 4 portfolios with different weights w on asset A (and therefore weight 1-w on B): w=-0.5, w=0.3, w=0.8, w=1.3. | ||||||||||||||||
| (b) Then sketch a portfolio frontier with the 4 portfolios, asset A and asset B (so a total of 6 data points), with return on y-asix, and standard deviation on x-axis Do it on Excel. | ||||||||||||||||
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts