Question: Draw an activity chart for a machine operator with the following operation. The relevant times are as follows: Prepare mill for loading (cleaning, oiling, and

Draw an activity chart for a machine operatorDraw an activity chart for a machine operatorDraw an activity chart for a machine operator

Draw an activity chart for a machine operator with the following operation. The relevant times are as follows: Prepare mill for loading (cleaning, oiling, and so on) Load mill Mill operating (cutting material) Unload mill 0.65 min 1.80 min 2.30 min 0.70 min Plot all required processes and their relevant times on the chart. Choose the correct graph below. O A. B. Time Operator Time Machine Time Time Operator Time Machine Time o Prepare Mill Prepare Mill Idle 1 1 1 - Idle 1 Lin TTT Load Mill Load Mill 2 2 2 2 Mill Operating (Cutting Material) 3 TTTTTT 3 3 w Mill Operating (Cutting Material) Idle LU Idle 4 4 4 4 5 5 5 5 Unload Mill 5 Idle 5 Unload Mill Idle 6 6 6 6 C. OD Time Operator Time Machine Time Time Operator Time Machine Time Prepare Mill Prepare Mill 1 1 1 1 1 Idle Load Mill Load Mill Idle 2 2 2 2 3 3 Mill 3 3 . 3 3 Idle Operating (Cutting Material Idle ILU Mill Operating (Cutting Material 4 4. 4. 4 4 5 Unload Mill 5 Idle 5 Unload Mill 5 Idle 6 6 6 6 - TI 6 6

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!