Question: Five batch jobs. A through E , arrive at a computer center at almost the same time. They have estimated running times of 10, 6,

 Five batch jobs. A   through , arrive at a computer center at almost the same time. They have estimated running times of 10, 6, 2, 4, and 8 minutes. Their (externally determined) priorities are 3, 5, 2, 1, and 4, respectively, with 5 being the highest priority. For each of the following scheduling algorithms, determine the mean process turnaround time. Ignore process switching overhead.

(a) Round robin.

(b) Priority scheduling.

(c) First-come, first-served (run in order 10, 6, 2, 4, 8).

(d) Shortest job first.

For (a), assume that the system is multiprogram med, and that each job gets its fair share of the CPU. For (b) through (d), assume that only one job at a time runs, until it finishes. All jobs are completely CPU bound.

Step by Step Solution

3.43 Rating (150 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

To solve this problem we need to calculate the mean process turnaround time for different scheduling algorithms Turnaround time is the total time take... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Operating System Questions!