Question: Learning Objective: The purpose of this exercise is to demonstrate the materials requirement planning (MRP) functionality in SAP system. As a first step, a small
Learning Objective: The purpose of this exercise is to demonstrate the materials requirement planning (MRP) functionality in SAP system. As a first step, a small test problem with five materials in a BOM is solved manually to determine planned order releases by carrying out MRP calculations. The problem is solved in a traditional way with weekly time buckets.
The main steps in this exercise are outlined below.
Calculate Planned Order Releases for materials A-XXX (YOUR IDES ###), B-XXX (YOUR IDES ###), C-XXX (YOUR IDES ###), D-XXX (YOUR IDES ###), and E-XXX (YOUR LEARN-###). Relevant data on independent requirements (forecast), BOM, and material master data are given below. The BOM for product A-XXX is shown below. One piece of D-XXX and two pieces of E-XXX are assembled to make one unit of C-XXX. Two pieces of C-XXX and one piece of D-XXX are needed to make one subassembly of B-XXX. Four units of B-XXX are further assembled to make one unit of the product A-XXX.
Please read this
Rest of the question is mentioned in the Picture attached. You have to fill the entire sheet in the last picture. The answer given before was incomplete and wrong.

NOTE 1- Lot Sime - EX [in SAP] Lot-for-fot [LH] is a lut sigine techique, where orders peoduced are the eact amouat needed. In a materials requienent planning (MenP) environment lot sise lo equal th the net requirements for that period. - [X [in SNP] fixed lot size whtich is alweys uses the same quantity (ar a mulipiple) for a rearder Note 2- Beginning Imentory - Assume there is no (rero) begirving inventory on any of the ittems
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
