Question: OptimisticMost pessimistic likely A local project being analyzed by PERT has following activities. Times Estimates (Days) Activity Activity Predecess name time Design A 10 20

OptimisticMost pessimistic" likely A local

OptimisticMost pessimistic" likely A local project being analyzed by PERT has following activities. Times Estimates (Days) Activity Activity Predecess name time Design A 10 20 26 NIL Build B 4 4 10 A prototype Evaluate 4 6 14 A equipment Test D 2 3 4 B prototype Produce E 1 5 6 report CD Procedures F 7 8 9 arrangement C,D Presentation G 2 6 7 F, E What is the probability that the project will be completed in 43 days or more? Select one: A. 0.7333 B. 0.7673 C. 73.33% D. 26.73% O E. 76.73% OptimisticMost pessimistic" likely A local project being analyzed by PERT has following activities. Times Estimates (Days) Activity Activity Predecess name time Design A 10 20 26 NIL Build B 4 4 10 A prototype Evaluate 4 6 14 A equipment Test D 2 3 4 B prototype Produce E 1 5 6 report CD Procedures F 7 8 9 arrangement C,D Presentation G 2 6 7 F, E What is the probability that the project will be completed in 43 days or more? Select one: A. 0.7333 B. 0.7673 C. 73.33% D. 26.73% O E. 76.73%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!