Question: PERT/CPM Project Network Estimated Time for each Activity: A=4 B=10 C=9 D=6 E=8 F=16 G=5 H=9 I=6 Plumbing 0 10 START Foundation Framing Wall Board

PERT/CPM Project Network Estimated Time for each

PERT/CPM Project Network Estimated Time for each Activity: A=4 B=10 C=9 D=6 E=8 F=16 G=5 H=9 I=6 Plumbing 0 10 START Foundation Framing Wall Board FINISH Paint Interior Create a spreadsheet listing the ES, EF, LS, LF, Slack, T for the Project to the left. Use the required formulas discussed in the slides Electrical 16 Pictures Siding Palit Exterior