Question: please i want the answer Q2. Based on the given table below, answer the questions. (20 points) Show all calculation steps in the answers Activiy

please i want the answer please i want the answer Q2. Based on the given
Q2. Based on the given table below, answer the questions. (20 points) Show all calculation steps in the answers Activiy Slope ID A Max. Crash Time Direct Costs Normal Time 5 6 Time 3 3 10 B Crash Cost ($) 110 160 120 110 200 80 140 12 14 8 Cost ($) 170 280 210 200 300 170 240 11 4 D E F G CPM IS A CEFG 10 7 5 7 a) Calculate the Max. crash time and slope (10 points) b) Crash the project for 7 weeks, calculate the total cost before and after crashing (10 points)