Question: Problem 1 Consider an assembly line with 3 sequential operations A , B , and C with processing rates 1 0 , 4 0 ,
Problem
Consider an assembly line with sequential operations A B and C with processing rates and parts per hour, respectively. Suppose there is one dedicated worker for A and B Abe and one dedicated worker for C Chris However, both workers are perfectly crosstrained.
HINT: The first step is to calculate the cycle times of operations A B and C
a What is the process capacity in parts per hour?
b Suggest a way of reassigning tasks to Abe and Chris so as to maximize the process capacity. What is the maximum process capacity?
c What is the cycle time of the process on a day when Chris is absent and Abe is the only worker?
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
