Question: Problem 3: A project with the following information: Activity Duration Predecessors A 3 5 A 7 A 3 B, C 5 B 4 D 2

Problem 3: A project with the following
Problem 3: A project with the following information: Activity Duration Predecessors A 3 5 A 7 A 3 B, C 5 B 4 D 2 C 5 E, F, G Total Resources Required Activity Duration A 18 3 weeks 5 weeks 7 weeks 20 28 3 weeks 18 G 5 weeks 10 H 4 weeks 16 2 weeks 6 5 weeks 30 Activity Duration LS LF Slack 146 A 3 3 0 3 5 3 5 10 2 7 3 10 3 10 3 10 13 10 13 E 5 8 13 12 17 4 F 4 13 17 13 17 G 2 10 12 15 17 5 H 5 17 22 17 22 a. Construct the project activity network using AON methodology. b. Identify the critical path and other paths through the network. c. Create a time-phased resource-loading table for this project, identifying the activity early start and late finish points. d. Assume that there is a maximum of eight resource hours per week available for the project. Can you identify any weeks that have resource overcommitments? e. Identify the activity that can be rescheduled and reconfigure the resource loading table to show this reallocation. AB B C D GH B C D E F ES 0 03 EF mc 8 32 NO ABCDEFGH Resource Hours Needed per Week 6 4 4 6 2 4 3 6 Total Total Float 2 4

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!