Question: Problem 5. Ratings were developed for a failure mode : Severity = 8, Occurrence = 2, Detection 1. What is the risk priority number (RPN)

Problem 5. Ratings were developed for a failure

Problem 5. Ratings were developed for a failure mode : Severity = 8, Occurrence = 2, Detection 1. What is the risk priority number (RPN) for this FMEA? (1 point)