Question: Problem solving 1. (3 points) The production scheduler for Marion Machine Shop has six jobs ready to be processed that can each be assigned to

Problem solving 1. (3 points) The production

Problem solving 1. (3 points) The production scheduler for Marion Machine Shop has six jobs ready to be processed that can each be assigned to any of six different workstations. Due to the characteristics of each job and the different equipment and skills at the workstations, the time to complete a job depends on the station it is assigned to. Following is data on the jobs and the time it would take to do each job at each workstation. Find the optimal schedule with minimum processing time for these jobs. (Show all your work) 1 6 Job A B C D E F 3.2 2.7 3.8 2.8 6.1 1.5 3.5 2.9 4 2.1 6.5 1.3 Job Completion Time at Workstation (hours) 2 3 4 5 2.9 3 4 2.3 3 3.1 4.3 4.5 4.1 2.9 2.5 3 6.7 7 6 1.9 2.9 4 3.6 3.7 3.6 2.2 6.2 3.6

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!