Question: Production planning and control question 29. Consider a production system of a factory in which group technology is tried to apply. Groups are planned to

Production planning and control question

Production planning and control question 29.

29. Consider a production system of a factory in which group technology is tried to apply. Groups are planned to include 4 machines however, it is not allowed to assign more than one F Machine in a single group because of the physical constraints. Utilizations are given in the table. Using single pass heuristic approach, construct a set of groups. Write the parts and machines assigned to each group. Is your solution optimal? Parts 1 2 3 4 5 6 7 Machine Type A 0.3 0.6 B 0.3 0.1 0.3 0.6 0.4 0.3 D 0.5 0.4 0.6 0.5 E 0.4 0.5 F 0.2 0.5 0.4 0.6

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!