Question: Qu.3 Based on the table given below, answer the questions. (30 points) Show all calculation steps in the answers Maximum Crash Time Direct Costs Slopel

Qu.3 Based on the table given below, answer the questions. (30 points) Show all calculation steps in the answers Maximum Crash Time Direct Costs Slopel Activity Normal Crash ID Time Cost (KD) Time Cost (KD) s 17 4750 15 5650 IT 13 12660 12 3000 U 125 |8200 2111200 V 14 4175 11 16500 w 19 7300 17 9700 X 16 6400 15 |8200 Y 19 3800 7 5000 CPM is T U WY a) Calculate the Maximum Crash Time and Slope. (7 points) b) Crash the project by 5 weeks. (10 points) c) What is the total cost of the project before and after crashing? Briefly explain all the costs included in the calculation. (7 points) d) Calculate and interpret the maximum crashing time for the overall project. (6 points)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
