Question: QUESTION 1 10 points Save Answer In a Design - Bid - Build delivery, both the Owner and the Contractor take risk/ True False QUESTION

QUESTION 1 10 points Save Answer In a Design -

QUESTION 1 10 points Save Answer In a Design - Bid - Build delivery, both the Owner and the Contractor take risk/ True False QUESTION 2 10 points Save Answer Anytime an Owner Interferes with a Contractor's methods, the Owner takes additional risk. True False QUESTION 3 10 points Save Answer A Delivery Method containing a Guaranteed Maximum Price shifts overrun cost risks to the Contractor. True False