Question: Sample Problem 1 The continuous timing method is used to direct time study a manual task cycle consisting of four elements: a, b, c, and

Sample Problem 1 The continuous timing method isSample Problem 1 The continuous timing method is

Sample Problem 1 The continuous timing method is used to direct time study a manual task cycle consisting of four elements: a, b, c, and d. Two parts are produced each cycle. Element d is a machine-controlled element and the time is constant. Assume performance rating to be 96% for all manual elements and all are external elements. Element e is an irregular element performed every five cycles. The PFD allowance is 9%. The machine allowance is 8%. a b d e Element Watch Time (min) 0.32 0.61 0.85 1.42 1.65 a. Determine the normal time for the cycle. (6 pts.) b. Determine the standard time per part. (4 pts.) Sample Problem 2 Based on ILO tabulation, what would be the allowance factor on a work element that requires the worker to stand and often strech to lift a. 10-1b boxes. Consider also that there is a surrounding environment with well below illumination and a loud intermittent noise level. The task is medium in terms of monotony and tediousness. (8 pts.) b. Based on your previous calculation, if the normal time is 3.85 minutes, what would be the standard time? (2 pts.)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!