Question: TB MC Qu. 19-28 Below is an activity network with times Below is an activity network with times (in weeks) shown above each node: What

 TB MC Qu. 19-28 Below is an activity network with times

TB MC Qu. 19-28 Below is an activity network with times Below is an activity network with times (in weeks) shown above each node: What is the critical path? Mulsiple Choice A.B-D.E.H A.B-E-F-H A.B-E-G.H A.C-G-H