Question: The continuous stopwatch timing method was used to obtain the observed times for a worker-machine task Only one cycle was timed. The data are recorded

The continuous stopwatch timing method was used

The continuous stopwatch timing method was used to obtain the observed times for a worker-machine task Only one cycle was timed. The data are recorded in the table below. The times listed indicate the stopwatch reading at the end of the element Elements a, b, and d are worker-controlled elements. Element is machine controlled. Elements a and d are external to the machine-controlled element, while element is internal Every four cycles, there is an irregular worker element that takes 1.44 min rated at 100% performance. For determining the standard time, the PFD allowance is 15% and the machine allowance is 30%. Worker element Description of worker element Time Performance Machine (min) Rating (6) element Description of machine element Time (min) a 09 100 Idle Acquire workpart from tray, cut to size and load into machine b 2.25 120 2.75 Enter machine settings for next cycle Automatic cycle controlled by machine settings entered in the previous cycle d Unload machine and 4.1 80 Idle place part on conveyor Determine (a) The observed time for each element (4 points) (a-1) Observed time for element a (a-2) Observed time for element b (a-3) Observed time for elemento (a-4) Observed time for element d (b) The normal time (2 points) (c) The standard time for the cycle (2 points) (d) If worker efficiency = 100% how many units will be produced in one 8-hour shift? (2 points) The continuous stopwatch timing method was used to obtain the observed times for a worker-machine task Only one cycle was timed. The data are recorded in the table below. The times listed indicate the stopwatch reading at the end of the element Elements a, b, and d are worker-controlled elements. Element is machine controlled. Elements a and d are external to the machine-controlled element, while element is internal Every four cycles, there is an irregular worker element that takes 1.44 min rated at 100% performance. For determining the standard time, the PFD allowance is 15% and the machine allowance is 30%. Worker element Description of worker element Time Performance Machine (min) Rating (6) element Description of machine element Time (min) a 09 100 Idle Acquire workpart from tray, cut to size and load into machine b 2.25 120 2.75 Enter machine settings for next cycle Automatic cycle controlled by machine settings entered in the previous cycle d Unload machine and 4.1 80 Idle place part on conveyor Determine (a) The observed time for each element (4 points) (a-1) Observed time for element a (a-2) Observed time for element b (a-3) Observed time for elemento (a-4) Observed time for element d (b) The normal time (2 points) (c) The standard time for the cycle (2 points) (d) If worker efficiency = 100% how many units will be produced in one 8-hour shift? (2 points)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!