Question: The likelihood the original critical path(s) will change once the project is initiated is referred to as: aflexibility. bsensitivity. cconcurrent engineering. dresilience

The likelihood the original critical path(s) will change once the project is initiated is referred to as: aflexibility. bsensitivity. cconcurrent engineering. dresilience