Question: The process batch at the constraint in a drum - buffer - rope system should be: A . the same size as that at any
The process batch at the constraint in a drumbufferrope system should be:
A the same size as that at any nonconstraint.
B of such a size as to improve utilization of the constraint.
C of such a size as to maximize the number of setups for the constraint
D the same size as the transfer batch.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
