Question: There are four critical paths in a network. A-B-C-D-E, A-F-G-E, A-H-J-K-L-E and A-S-T-E. Each activity in this network can be crashed by 5 days. The
There are four critical paths in a network. A-B-C-D-E, A-F-G-E, A-H-J-K-L-E and A-S-T-E. Each activity in this network can be crashed by 5 days. The maximum possible reduction in the project duration will be:
a. 20 days
b. 30 days
c. 65 days
d. insufficient information
e. 25 days