Question: Using the data set, draw a network diagram ( Fig . 6 . 4 ) and complete a forward and backward pass ( Fig .
Using the data set, draw a network diagram Fig and complete a forward and backward pass Fig and
What activities are on the critical path Fig
What is the project duration?
Step : Build the Gantt Chart Fig
Hangar Activity Detail
Task Name Duration cost Predecessors
Hangar Permitting days
Application days
Process time days
PreOrder building materials days
Hangar Permitting Complete days
Hangar Ground Work days
Survey property days
Set elevation days
Prepare site for concrete days
Construct tarmac and hangar
foundation days
Build concrete forms days
Install plumbing passing
through concrete Internal Sewer days
Schedule code inspections day
Order concrete day
Pour concrete days
Concrete cured days
Order specialty equipment days
Compressors and air systems day
Crane and lift equipment day
Hangar Groundwork Complete days
Hangar Assembly days
Assemble Frame days
Install Crane days
Assemble outer structure days
Install Hangar Door days
Install electrical systems days
Install low voltage systems days
Install plumbing systems days
Air systems days
Water systems days
External Sewer systems days
Connect to outside sources days
Finish inside areas days
Hangar Assembly Complete days
Open House day
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock