Question: What is the flow conservation constraint for node 4 of the pictured network of the transshipment problem? ( The LHS is 1 6 0 ,

What is the flow conservation constraint for node 4 of the pictured network of the transshipment problem? (The LHS is 160,
you just need to enter the RHS).
The following example shows the right form in which a potential answer should be written as:
x_12- x_32+8*x_54
where x12 represents the decision variable for link (1,2),x32 represents the decision variable for link (3,2).
Remember to write your expression with * if you wish to show multiplication. For example, the entry in the form of x12-x32
+8x-54(with missing *) is regarded as an incorrect answer.
 What is the flow conservation constraint for node 4 of the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!