Question: Worker element (min) Machine element (min) a (0.90) b (1.97) C (2.84) e (3.76) d (2.64) The continuous timing method was used to obtain the

Worker element (min) Machine element (min) a
Worker element (min) Machine element (min) a (0.90) b (1.97) C (2.84) e (3.76) d (2.64) The continuous timing method was used to obtain the times for a worker-machine task Only on cycle was timed. The observed time data are recorded in the table above. Elements a, b, c, and e are worker-controlled elements. Element d is machine controlled Elements a, b, and e are external to the machine-controlled elements, while element is internal. There are no irregular elements All worker-controlled elements were performance rated at 70%. The PFD allowance is 10% and the machine allowance is 15%. Determine the standard time for the cycle. 3.31 minutes 2.90 minutes 3.00 minutes 2.69 minutes

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!