Question: You are allowed three pictures for this problem. Must use pen to answer Show all calculations/result to TWO PLACES AFTER THE DECIMAL POINT (except when

You are allowed three pictures for this problem.

You are allowed three pictures for this problem. Must use pen to answer Show all calculations/result to TWO PLACES AFTER THE DECIMAL POINT (except when all succeeding digits are zeros). Must show all calculations/steps. Failure to do so will result in a score of "0" even final answer is correct Atkinson Manufacturing Company (AMC) produces two models of snow blowers SB-K73 and SB-V82 Each SB-K73 is made of 3 units of C, and 3 units of D, while each SB-V82 is made of 2 units of D and 2 units of A. Each unit of D is composed of 3 units of A, 2 units of B and 2 units of C. Each unit of C is composed of 1 unit of B. Lead Time for SB-V82, and D is one week, for C is three weeks, all other remaining items having lead time of two weeks. Currently, AMC has 25, 1400, and 355 respective unit of SB-V82, B, and C as beginning inventories. However, AMC has no SB-K73, A, and D on hand. AMC scheduled to receive 690, 230 and 460 units of A in weeks 4, 5 and 6 respectively, 315, 420 and 525 units of B in weeks 1, 2 and 6 respectively; 400 and 415 units of C in weeks 3 and 6 respectively, 180 units of D in week 7. Multiples of 240, and 105 lot sizes are used for A, and B respectively, while SB-K73, and SB-V82 use L4L lot sizes, and Minimum of 350, and Minimum of 260 lot sizes are used for C and D respectively. Demand for SB-K73 are 50, 90 and 140 in week-7, week-8 and week-9 respectively, while demand for SB-V82 are 75, 130, 50, and 45 in week-6, week-7, week-8 and week- 10 respectively. Item C is a belt used in snow blowers and it has an independent demand of 180 and 210 units in weeks 6 and 9, respectively. a Construct/Draw the bill of materials (low-level coded product structure tree/s) of the finished goods. Make sure to show the low-level code of each item in your product structure tree? b. Determine when the orders should be released for SB-K73, SB-V82, A, B, C, and D, and the size of those orders. (You may not get full marks if table is not filled completely, a blank space in the table means the value there is O!) (Use as many tables as you need) Note: Table required for this question is available/posted on Moodle. When you complete this Question, upload the solution immediately before moving to the next question. If this is your last question, then submit your test. Remember: Moodle does not allow you to change or upload images in last minute. here to search F2 FS A F6 FZ F8 F9 F10 F11 / $ % ? & **

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!