Question: With reference to Problem 6.32 data, roof rock above the upper A Level is Bonneterre dolomite that is overlain by Davis shale. (a) Determine the
With reference to Problem 6.32 data, roof rock above the upper A Level is Bonneterre dolomite that is overlain by Davis shale.
(a) Determine the maximum opening width that is physically possible in the upper A Level ore horizon.
(b) With reference to Problem 6.32, assume square pillars, then determine minimum pillar width with respect to ore strength, given the results of part a.
(c) What safety factor for the A Level roof would you recommend and why?
Step by Step Solution
3.32 Rating (155 Votes )
There are 3 Steps involved in it
Given ALevel roof rock in Bonneterre dolomite and D... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
26-E-G-R (268).docx
120 KBs Word File
