Question: You have been serving as Electroscans project manager and are now well along in the project. Develop a narrative status report for the board of
.png)
555 Acom Street, Suite 5 Boston, Massachusets 29 In-store Scanner Project thousands of dollars) Actual Progress as of January 1 Name EV BAC EAC 476 -81 1103 H1.1 Hardware 15 Hardware des H 1.3 Hardware 10 H1.4 Prototys H1.5 Test H 1.7 OP 1.1 Kemel (PD uction models (P 100 431 tions (DS 15 21 OP 12.1 Disk drivers (DEV OP 12.2 VO drivers (DEV OP 1.3 Code software 105 240 OP 1.3.1 Code software OP 13.2 Document sofitware (DOC) OP 1.3.3 Code interfaces OP 1.3.4 Beta test software U 1.0 Utilities 87 108 148 274 U1.1 Utilities specifications (DS U1.2 Routine utilities (DEV 45 x utilities (DE 150 U1.4 Utilities docurnentation 5 Beta test utilities S1.0 125 153 S11 Architecture decisions(DS S 1.2 ation hard soft (D #5 75 nt System hard/software test S 1.4 t documentation (DOC 5 Integration acceptance testing (T
Step by Step Solution
3.42 Rating (168 Votes )
There are 3 Steps involved in it
Rollup See rollup of Scanner Project by SV CV and VAC Also see summary sheet of variances for WBS and OBS Facts 1 The Coding Team is in trouble on cos... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
177-B-M-L-P-M (1471).docx
120 KBs Word File
