Question: A construction project has indirect costs totaling $ 40,000 per week. Major activities in the project and their expected times in weeks are shown in
A construction project has indirect costs totaling $ 40,000 per week. Major activities in the project and their expected times in weeks are shown in this precedence diagram:

Crashing costs for each activity are

a. Determine the optimum time– cost crashing plan.
b. Plot the total- cost curve that describes the least expensive crashing schedule that will reduce the project length by six weeks.
7 4 8 11 11 8. 13 5 12 4 6 1 3 9 3 12 9 4 6. 10 2) 12
Step by Step Solution
3.36 Rating (177 Votes )
There are 3 Steps involved in it
Indirect costs total 40000 per week a Determine the optimum timecost crashing plan We will continue crashing as long as the crashing cost at a given step 40 Step 1 The paths and their expected duratio... View full answer
Get step-by-step solutions from verified subject matter experts
Document Format (1 attachment)
372-B-M-L-O-M (3495).docx
120 KBs Word File