Question: Consider a project with the following information: a. Construct the project activity network using AON methodology and label each node. b. Identify the critical path
.png)
a. Construct the project activity network using AON methodology and label each node.
b. Identify the critical path and other paths through the network.
Activity Duration Predecessors B, C E, F, G Activity Duration ES EF LS LF Slack 10 2 10 3 10 10 13 10 13 13 12 17 4 13 17 13 17 10 12 15 17 5 17 22 17 22
Step by Step Solution
3.39 Rating (174 Votes )
There are 3 Steps involved in it
a b The Critical Path is A C D F H Alternative p... View full answer