Question: In the website development project network shown in the following figure, the number alongside each activity designates the activity duration (TE) in weeks.LO1 Determine: a.

In the website development project network shown in the following figure, the number alongside each activity designates the activity duration (TE) in weeks.LO1

Start A2 D3 E5 18 H4 End B4 J2 F6 C3 G4

Determine:

a. The ES and LS for each activity.

b. The earliest time that the website can be completed.

c. The slack on all activities.

d. The critical activities.

e. The critical path.

Start A2 D3 E5 18 H4 End B4 J2 F6 C3 G4 L3