Question: 1) The critical path for the network activities shown below is with duration Immediate Activity Duration Predecessors A 2 B 4 -- C 6 A,B

1) The critical path for the network activities shown below is with duration Immediate Activity Duration Predecessors A 2 B 4 -- C 6 A,B D 1 A,B E 2 B,C.D 2) Activity Preceding Optimistic Probable Pessimistic A 5 11 14 B 3 9 6 10 14 D A, B 5 7 E B 6 11 C 6 8 13 G D. E 2 4 6 H F 3 3 9 a. Calculate the expected duration and variance of each activity. b. Calculate the expected duration and variance of the critical path. C. Calculate the probability that the project will be completed in less than 28 weeks. 3) Three critical path activities are candidates for crashing on a CPM network. Activity details are in the table below
Step by Step Solution