Question: 13 The snapback timing method in direct time study was used to obtain the times for a workermachine task. The recorded times are listed in

 13 The snapback timing method in direct time study was used

13 The snapback timing method in direct time study was used to obtain the times for a workermachine task. The recorded times are listed in the table below. Element c is a machinecontrolled element and the time is constant. Elements a,b, and d are operator-controlled and were performance rated at 90%. Elements a and b are external to machine-controlled element c. Element d is internal to the machine element. The machine allowance is zero, and the PFD allowance is 13%. Determine (a) the normal time and (b) the standard time for the cycle. The worker's actual time spent working during an 8-hour shift was 7.08 hours, and he produced 420 units of output during this time. Determine (c) the worker's performance during the operator-controlled portions of the cycle and (d) the worker's efficiency during this shift

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!