Question: The snapback timing method in direct time study was used to obtain the times for an injection molding task. Only element d is a machine-controlled

The snapback timing method in direct time study was used to obtain the times for an injection molding task. Only element d is a machine-controlled element. a, b, c, and e elements are all external to machine-controlled element d, but f and g elements are internal. The machine allowance is 10%, and the PFD allowance is 15%. Determine

(a) the normal time for the cycle

(b) the standard time for the cycle

Element

Description

Observed time (min)

Performance rating (%)

a

Worker load raw material into the hopper. (every 20 cycles)

6

90%

b

Worker adjust the temperature and injection pressure. (every 10 cycles)

2.5

90%

c

Worker starts the injection modeling machine.

0.05

90%

d

Molten plastic is injected to the mold cavity and after solidification the part is ejected.

1.1

N/A

e

Worker removes the part and starts the machine again.

0.1

90%

f

Worker separates runner and sprue from the part.

0.03

90%

g

Worker deposits part in container and runner and sprue in scrap container.

0.03

90%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock