Question: Q4. The snapback timing method in direct time study was used to obtain the times for a worker-machine task as indicated in the table below.

Q4. The snapback timing method in direct time
Q4. The snapback timing method in direct time study was used to obtain the times for a worker-machine task as indicated in the table below. Element c is a machine-controlled element and the time is constant. Elements a,b,d, e, and f are operator-controlled and were performance rated at 95%; they are all external elements performed in sequence with machine element c. The machine allowance is 30%, and the PFD allowance is 15%. (a) Determine the standard time for the cycle. i) 1.980min ii) 2.435min iii) 3.245min iv) 4.943min (b) If the operator works at 100% of standard performance in production and one part is produced each cycle, how many parts are produced if the total time worked during an 8-hour day is 7.25 hours? i) 94 ii) 105 iii) 168 iv) 214 (c) What is the worker's efficiency for this shift? i) 90% ii) 95% iii) 100% iv) 108%

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!