Question: (3) An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device. Task Description Predecessor(s) Time

(3) An electronics manufacturer makes remote control devices for interactive-cable-TV systems. The following assembly tasks must be performed on each device.

Task

Description

Predecessor(s)

Time (min.)

A

Place circuit into circuit frame

--

0.50

B

Solder circuit connections to central circuit control

A

0.70

C

Place circuit assembly in device frame

B

0.40

D

Attach circuit assembly to device frame

C

0.30

E

Place and attach display to frame

--

0.30

F

Place and attach keypad to frame

--

0.20

G

Place and attach top body of device to frame

E, F

0.35

H

Place and attach battery holder to frame

D

0.40

I

Place and attach bottom body of device to frame

G, H

0.60

J

Test device

I

0.30

a. Draw the precedence diagram for this problem.

b. What cycle time will allow the production of 200 units over a ten-hour day? - 3 units per minute

c. Balance this assembly line using the heuristic of highest task time.

d. What is the line efficiency?

e. How many units the assembly line can produce?

I need help with C-E.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!